Project Scope:
Design, installation, and operation of a Deep Well Dewatering system to manage groundwater levels and ensure safe excavation for foundation.
Description:
Al Bustan Land Dewatering L.L.C. executed the complete Deep Well Dewatering works for this project, tailored to challenging site conditions with high water tables. The system included borehole drilling, well installation, submersible pumps, header piping, and controlled discharge to maintain dry excavation areas.
Result:
The Deep Well Dewatering system successfully achieved the required groundwater drawdown, providing stable and safe conditions for piling, foundation, and shoring operations. The project was completed efficiently, on schedule, and with minimal disruption to the surrounding environment.
Location: Sharjah
Client: Confidential
Services: Deep Well Dewatering, Groundwater Control, Excavation Support