Project Scope:
Design, installation, and operation of a Deepwell Dewatering system to control groundwater levels and maintain safe excavation conditions for foundation and shoring works.

Description:
Al Bustan Land Dewatering L.L.C. successfully executed complete Deepwell Dewatering works for this project, ensuring effective groundwater lowering in challenging soil and site conditions. The system was designed based on detailed site evaluation, including groundwater table depth, permeability, and excavation geometry.

Our scope included borehole drilling, well installation, submersible pump setup, header piping, and discharge management in compliance with local authority regulations. Continuous water-level monitoring and pump maintenance were carried out to ensure efficient performance throughout the excavation phase.

Result:
The dewatering operation achieved the required drawdown level, allowing safe, dry, and stable conditions for foundation, piling, and shoring activities. The system operated efficiently within the planned schedule and with minimal environmental impact.

Location: Ajman
Client: Confidential
Services: Deepwell Dewatering, Groundwater Control, Foundation Support